When the Container Is the Problem

When the Container Is the Problem truck

Breakbulk and Project Cargo

Containers are efficient precisely because everything about them is standard, which is no help at all when the cargo is not. Breakbulk means shipping the item as it is - loaded loose into the hold, or secured onto a flat rack or open top where the height or width simply will not close a door. It is a different booking, a different rate structure and a different loading plan. Part of our sea freight services.

What Ships This Way truck

Cargo That Needs Breakbulk

The test is simple: if it does not fit, or fitting it would damage it, it goes breakbulk.

  • Industrial plant and production machinery
  • Structural steel and fabricated sections
  • Generators, transformers and vessels
  • Construction and mining equipment
  • Boats, hulls and large assemblies
  • Complete project consignments
What Ships This Way

Shipping Something Too Big? truck

Send the dimensions, the weight and the two ports

Get a Breakbulk Quote Call +971 4 239 7107
What Changes Versus a Container

How Breakbulk Is Priced and Planned

Almost every assumption from container shipping stops applying, which is where budgets go wrong.

Rates are negotiated, not listed

Breakbulk is quoted per shipment against the dimensions, weight and the vessel's own loading plan rather than from a rate sheet.

The vessel has to suit the cargo

Not every service takes breakbulk, and not every port handles it. Sailing options narrow considerably, which affects timing more than cost.

Lifting is part of the booking

The item has to be lifted on and off, with slinging points identified in advance - see oversized and heavy cargo handling.

Securing is engineering

Cargo in a hold has to survive weeks of vessel movement. Lashing and bracing are calculated, not improvised.

Getting it to the quay

A breakbulk booking assumes the item is already at the port. Moving something that will not containerise across Dubai is its own exercise in permits and route planning, and it usually takes longer than the loading does.

Flat Rack or Loose?

Flat Rack or Loose? truck

Two Different Answers

Not all non-containerised cargo ships the same way.

  • Flat racks and open tops

    Cargo that exceeds a container in one dimension only. It keeps container handling and slots into normal services.

  • Loose in the hold

    Genuinely large items shipped as breakbulk on a suitable vessel, with a bespoke loading and lashing plan.

  • Prepared before it ships

    Machinery cleaned, preserved and braced first - see machinery packing.

Why Cannata truck

The Landside Is Ours Too

A breakbulk booking without a plan for getting the item to the quay is half a service. That road leg is usually the harder half.

Lifting arranged

Cranes and heavy handling organised as part of the job rather than left with you to source.

Delivered to the berth

Movement to the port on our own low-beds and flatbeds.

Cleared by us

Project consignments often need careful classification, handled by our own customs team.

Rate Request

Get a price for this shipment

Give us the route and the cargo and we will come back with a rate, usually within one working day.

Enquiring about Breakbulk & project cargo

Up to 5 files, 8 MB each. PDF, Word, Excel or images.

We reply to every enquiry. Your details are never shared.

Our FAQs

Frequently Asked Questions

What shippers ask about breakbulk.

Shipping cargo that will not go in a container - carried loose in the vessel's hold, or secured onto a flat rack or open top where the item exceeds container dimensions.

When the cargo exceeds container dimensions in one direction only. A flat rack keeps normal container handling and a much wider choice of sailings.

Per shipment, against dimensions, weight and the vessel's loading plan. There is no rate sheet, which is why quotes need accurate measurements rather than estimates.

Yes. Lifting on and off, with slinging points identified in advance, is part of the booking rather than something left to you to organise separately.

Usually. Machinery is cleaned, preserved against corrosion and braced before shipping, because a long voyage is harder on it than the lifting is.

Exact dimensions and weight, what the item is, whether it has projecting or loose parts, the two ports, and when it needs to move.